I had a classic ‘tech fails you when you need it most’ moment this week. I was mid-way through an important video call when my laptop decided to update—completely unprompted. Cue frantic phone scrabbling and some very creative time-filling from my colleague while I rebooted. It reminded me how crucial contingency planning is—whether it’s for a meeting or a project deadline!

That’s my week—how’s yours been?

✳️ The Main Event: Do You Have a Hide Like a Rhino?

Contracting isn’t for the faint-hearted. One minute, you’re flying high with a great client, the next? Your contract’s cut short, feedback is brutal, or a recruiter ghosts you after “pushing hard for you.”

This is where mental resilience makes all the difference. It’s not just about bouncing back—it’s about staying calm under pressure, handling rejection, and maintaining confidence no matter what’s thrown at you.

How to Build Mental Toughness as a Contractor:

📌 Control the Chimp 🐵 – Ever read The Chimp Paradox? Your brain has an emotional “chimp” that loves to panic. Recognising when it’s hijacking your thoughts (and stopping it) can be a game-changer.

📌 Detach from the Noise 🎭 – Clients will criticise. Recruiters will ghost. Projects will fall apart. Don’t take it personally—view every setback as data, not failure.

📌 Power Posing Before Big Moments 💪 – Amy Cuddy’s research shows that adopting strong body language for just two minutes can reduce stress and boost confidence. Try it before an interview, negotiation, or client meeting.

📌 Mindfulness & Thought Control 🧠 – 80% of our thoughts are negative, and most are recycled from the day before. Training yourself to challenge these patterns keeps you focused and resilient.

Being a contractor means rolling with the punches. Develop a hide like a rhino, and no setback will knock you off course for long.

🔠 Acronym Buster: FTE

  • F - Full
  • T - Time
  • E - Equivalent

Ever heard the term FTE thrown around in meetings and nodded along, pretending you knew exactly what it meant? You’re not alone. FTE (Full-Time Equivalent) is one of those acronyms that sounds more complicated than it actually is.

Simply put, FTE is a way of measuring workload in terms of full-time employees. If one person works full-time, they’re 1.0 FTE. If two part-time employees each work half the hours of a full-time role, together they equal 1.0 FTE. It’s how businesses compare workloads, budget resources, and make sense of headcount in project planning.

Why does this matter to contractors? If a project needs 5 FTEs to deliver and the client only funds 3, expect chaos—and negotiate accordingly.

🤦 The Weekly Wreck: When Excel Errors Cost $6 Billion

📅 2012: JP Morgan relied on an Excel-based risk model to manage billions in assets.

💥 The problem? The spreadsheets were full of errors, and no one checked them properly.

💰 The result? A $6.2 billion loss, regulatory fines, and a corporate reputation in tatters.

🫠 The Lesson? Never blindly trust systems or numbers—whether it's a project budget, contract terms, or your own financials. Check, challenge, and verify everything.

Your Next Steps:

🚀 Strengthen your mindset – Build resilience so setbacks don’t derail you.
🎯 Negotiate smartly – FTE numbers tell you a lot about a project’s reality.
📢 Check everything – Assumptions (and spreadsheets) can be very expensive mistakes.

Tough skin, sharp mind, steady nerves—that’s the contractor’s winning formula.

Until next time, happy contracting 💪

Hear more from Mark

Practical AI and business lessons from someone running businesses on it. One email a week, no fluff.

I'll never spam you. Unsubscribe any time.

Let's talk

LinkedIn